Equipment for sorting articles into bags

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855586
APP PUB NO 20170128985A1
SERIAL NO

15319034

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Sorting equipment for sorting articles (3), into receptacles (6) that are open at their tops, comprises shuttle cart and trolley assemblies (2) that can move independently so that each of them moves an article from a loading point (4) to a receptacle, wherein each shuttle cart and trolley assembly has a carrying deck (10) for carrying an article, which deck is suitable for overlying the opening in the top of a receptacle, and retaining means (16) above the openings in the receptacles, which leave a space (18) for allowing a carrying deck to pass between the retaining means and the opening in a receptacle, and retain the article loaded on the carrying deck above the opening in the receptacle when the shuttle cart and trolley assembly moves away from the receptacle in such a manner that the article falls by gravity into the receptacle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLYSTIC14 AVENUE RASPAIL GENTILLY CEDEX 94257

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chirol, Luc Paris, FR 17 66
Miette, Emmanuel Saint Gratien, FR 29 458

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00