Connecting apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10024343
APP PUB NO 20170122344A1
SERIAL NO

15318389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connecting apparatus connects to a main component (10) having a plurality of mutually adjacent fluid passage points (P′1, P′2, P′3, P′n . . . P′x). The connecting apparatus has a main body (12) controlling a fluid flow by a valve. A plurality of further fluid passage points (P1, P2, P3, Pn . . . Px) can be connected to each other in a fluid-conducting manner via the functional component (14) with assignable fluid passage points in the main component (10). One shut-off part, which shuts off the respective fluid passage point (P′2, P′3, P′n . . . P′x−1) in the main component (10) and/or in the fluid passage point remains unaffected by the functional component (14). In each case a fluid-conducting connection line (30, 32) is inside the main body (12) between the further fluid passage points (P1, P2, P3, Pn . . . Px) and the functional component (14) and can be shut off by a separate shut-off part, as long as the associated connection to the functional component (14) remains unused.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYDAC TECHNOLOGY GMBH66280 SULZBACH / SAAR

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biwersi, Sascha Alexander Mettlach, DE 14 20
Hettiger, Marcus Saarlouis, DE 8 43
Stoenner, Christoph St. Ingbert, DE 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00