Solid rocket motors including flight termination systems, and related multi-stage solid rocket motor assemblies and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10781773
APP PUB NO 20170122259A1
SERIAL NO

14932895

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid rocket motor comprises a pressure vessel, a solid propellant structure within the pressure vessel, and a flight termination system overlying the pressure vessel. The flight termination system comprises a shaped charge configured and positioned to effectuate ignition of an inner portion of the solid propellant structure and a reduction in an ability of the pressure vessel to withstand a change in internal pressure. Another solid rocket motor, a multi-stage rocket motor assembly, and a method of destroying a launch vehicle in flight are also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHROP GRUMMAN SYSTEMS CORPORATION2980 FAIRVIEW PARK DRIVE FALLS CHURCH VA 22042-4511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braithwaite, Paul C Brigham City, US 12 289
Kliger, Joseph J Deweyville, US 2 26
Liechty, Brian C Tremonton, US 1 5
Patterson, Donald B Smithfield, US 16 142

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00