Long and high resolution structures formed by additive manufacturing techniques

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10870150
APP PUB NO 20170120336A1
SERIAL NO

15337228

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of additive manufacture suitable for large and high resolution structures is disclosed. The method may include sequentially advancing each portion of a continuous part in the longitudinal direction from a first zone to a second zone. In the first zone, selected granules of a granular material may be amalgamated. In the second zone, unamalgamated granules of the granular material may be removed. The method may further include advancing a first portion of the continuous part from the second zone to a third zone while (1) a last portion of the continuous part is formed within the first zone and (2) the first portion is maintained in the same position in the lateral and transverse directions that the first portion occupied within the first zone and the second zone.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEURAT TECHNOLOGIES INC265 BALLARDVALE ST WILMINGTON MA 01887

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berdichevsky, Eugene Oakland, US 88 1384
DeMuth, James A Woburn, US 103 861
Fees, Heiner Bietigheim-Bissingen, DE 105 810
Kamshad, Kourosh Hudson, US 42 460
Leard, Francis L Sudbury, US 77 815
Toomre, Erik Los Altos, US 51 562

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B29C Class
  • 0 % this patent is cited more than
  • 5 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges15431001308101 - 1011 - 2021 - 3031 - 40010020030040050060070080090010001100120013001400150016001700

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2032