Manufacturing method of test socket and test method for semiconductor package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10470315
APP PUB NO 20170118846A1
SERIAL NO

15259352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Configuring a test socket to electrically couple a semiconductor package to a test device includes preparing a test socket including a base material and a first conductive portion included in the base material. The first conductive portion may extend in a thickness direction of the base material. Configuring the test socket may include forming a second conductive portion including conductive ink on the first conductive pattern. The second conductive portion may be formed based on printing conductive ink on the first conductive portion. The configuring may include forming the second conductive portion to repair the test socket. The first conductive portion may be degraded such that a top surface of the first conductive portion includes a surface depression. The second conductive portion may fill the surface depression. The first and second conductive portions may be integral with each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDSUWON-SI 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Min, Young-gi Asan-si, KR 3 8
Shin, Dong-uhn Seoul, KR 2 0
Song, Jae-ho Cheonan-si, KR 27 199
Yamada, Daisuke Asan-si, KR 216 1730

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00