Paper sheet processing device and partition card

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10789802
APP PUB NO 20170116810A1
SERIAL NO

15332094

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A paper sheet processing device includes: a charging inlet that takes in paper sheets in a conveyance direction, the paper sheets including at least one target sheet and a partition card overlapped on the target sheet, the partition card having a main surface portion having at least one identification hole group, the identification hole group having at least two through holes arranged along the conveyance direction; a detection unit that detects take-in of the paper sheets by the charging unit, and detects the identification hole group; and a control unit that determines a paper sheet is the partition card in a case where the identification hole group has been detected by the detection unit, and determines that a paper sheet is the target sheet in a case where the identification hole group has not been detected by the detection unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAUREL PRECISION MACHINES CO LTD1-12-5 NISHI-SHINSAIBASHI CHUO-KU OSAKA-SHI OSAKA 5420086

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ebine, Junji Urayasu, JP 4 39
Inake, Toru Kasukabe, JP 4 3
Kuroe, Akiyoshi Kawaguchi, JP 1 3
Nakamura, Makoto Okegawa, JP 369 5498
Tsuji, Keiji Saitama, JP 9 394

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00