Flow control in subterranean wells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10738565
APP PUB NO 20170107785A1
SERIAL NO

15390976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of controlling flow in a subterranean well can include a device introduced into the well being conveyed by flow in the well, the device comprising a material selected from poly-vinyl alcohol, poly-vinyl acetate and/or poly-methacrylic acid. The material may degrade in the well. A system for use with a well can include a flow conveyed device conveyed through a tubular string by flow in the tubular string, and the flow conveyed device including a material selected from poly-vinyl alcohol, poly-vinyl acetate and/or poly-methacrylic acid. A flow conveyed device for use in a subterranean well can include a body and a degradable material extending outwardly from the body, the degradable material being formed as a film, tube or filament.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THRU TUBING SOLUTIONS INC2033 NORTH MAIN STREET NEWCASTLE OK 77056

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferguson, Andrew M Moore, US 78 1407
Funkhouser, Gary P Roman Forest, US 114 2596
Schultz, Roger L Newcastle, US 299 9082
Watson, Brock W Sadler, US 90 1670

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00