Process for preparing solvent-free aqueous polyurethane dispersion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10676562
APP PUB NO 20170107319A1
SERIAL NO

15291138

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing solvent-free aqueous polyurethane dispersion modified with acrylic grafting is divided into four steps. The first step is a reaction of a diisocyanate with a polyol to prepare a prepolymer; the second step involves diluting the prepolymer with an acrylate monomer and adding a sulfonate-based chain extender to react; the third step involves adding deionized water and a water-soluble diamine-based chain extender to obtain a solvent-free sulfonate-based aqueous polyurethane dispersion; and the fourth step involves letting the aqueous polyurethane become modified with acrylic grafting. The resulting aqueous polyurethane has excellent mechanical strength, heat resistance and water resistance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAN YA PLASTICS CORPORATIONNO 380 SEC 6 NANJING E RD NEIHU DIST TAIPEI CITY 114030

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Sen-Huang Taipei, TW 38 33
Liao, Te-Chao Taipei, TW 380 152
Tsai, Chia-Lung Taipei, TW 26 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 9, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 9, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00