Gas control system and program for gas control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10138555
APP PUB NO 20170101715A1
SERIAL NO

15291264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas control system includes: a first valve that is provided in a carrier gas line or in a gas supply line; a flow rate control mechanism that is provided in a diluent gas line and includes a flow rate sensor and a second valve; a contactless type first concentration sensor; a first valve control part; a diluent gas setting flow rate calculation part adapted to, on the basis of a preset setting total flow rate of a post-dilution mixed gas and a post-dilution measured concentration, calculate a diluent gas setting flow rate that is a flow rate of a diluent gas to be flowed through the diluent gas line; and a second valve control part adapted to control the opening level of the second valve so as to decrease the deviation between the diluent gas setting flow rate and a measured flow rate measured by the flow rate sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HORIBA STEC CO LTDKYOTO 601-8116

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Minami, Masakazu Kyoto, JP 24 415
Nishizato, Hiroshi Kyoto, JP 14 239
Takijiri, Kotaro Kyoto, JP 20 90
Teraoka, Atsuko Kyoto, JP 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 27, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 27, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00