Multi-purpose reactor and process for the preparation of modified bitumen

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10260003
APP PUB NO 20170101583A1
SERIAL NO

14877321

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reactor is provided for the preparation of modified bitumen, which reactor comprises a horizontal housing comprising a cylindrical wall and two side walls, wherein a bitumen inlet has been provided at or near one of the side walls of the housing and a bitumen product outlet has been provided at or near the opposite side wall of the housing, wherein a plurality of inlets for the provision of oxygen-containing gas has been provided in the cylindrical wall of the housing between the bitumen inlet and the bitumen product outlet, which multi-purpose reactor is further provided with a mixer arranged inside the housing comprising at least one rotor rotating within at least one stator having a plurality of openings. The reaction is used to prepare modified bitumen by contacting bitumen in the reactor with a modified elevated temperature and pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHELL OIL COMPANYA CORP OF DE HOUSTON TX 77001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bran, Roberto Brisbane, AU 3 5
Kumar, Cheluva Bangalore, IN 3 5
Raj, Sachin Kuala Lumpur, MY 3 5
Scott, Daryl Brisbane, AU 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00