Variator-assisted transmission and launch control methods for such a transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10322723
APP PUB NO 20170101100A1
SERIAL NO

15315230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A launch control method for a continuously variable transmission (CVT) is provided, where the CVT comprises a hydro-mechanical variator, a summing transmission connected to an output side of the variator, and a clutch for selectively connecting the summing transmission to an output member. The method determines whether a launch has been requested, and adjusts a variable displacement pump of the variator to a predetermined fixed displacement. Engagement of the clutch is commenced, and the method then determines whether a predetermined degree of slip exists between input and output elements of the clutch. The clutch is held at its present state of engagement when the predetermined degree of slip has been established, and the variator is placed into a torque control mode. The method then determines when there is zero slip between the input and output elements of the clutch, and then instructs full engagement of the clutch. The method then holds the pump of the variator at its current displacement until a predetermined time period has elapsed, before reverting to a standard transmission control algorithm. A CVT is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PERKINS ENGINES COMPANY LIMITEDFRANK PERKINS WAY EASTFIELD PETERBOROUGH PE1 5FQ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lister, Brian E Edwards, US 16 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00