Dispersion encoded full range optical coherence tomograph

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10024649
APP PUB NO 20170089688A1
SERIAL NO

15305324

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for optical coherence tomography (OCT) comprises a light source, a first arm, a second arm, and a processing unit. The first arm has a first dispersive optical assembly that induces a first amount of dispersion into light from the light source and traversing the first arm, where the first arm is one of a sample arm and a reference arm of an interferometer. The second arm has a second dispersive optical assembly that induces a second amount of dispersion into light from the light source and traversing the second arm, where the second arm is the other of the sample arm and reference arm. The second amount of dispersion is larger than the first amount of dispersion. The processing unit processes an interferometry signal to perform OCT, where the interferometry signal represents a superposition of the light from the first arm and the light from the second arm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALCON INCRUE LOUIS-D'AFFRY 6 FRIBOURG 1701

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Loerner, Johannes Erlangen, DE 6 10
Massow, Ole Bergen, DE 11 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00