Arrangement for producing a pipe connection and holding element for such an arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10330231
APP PUB NO 20170082229A1
SERIAL NO

15270056

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipe connection assembly having a fitting, an end section of the fitting for receiving a pipe end, a sealing ring, a separating ring, a cutting ring and a holding element, wherein the fitting has an inner section with an inner diameter adapted to the outer diameter of the pipe end to be received, wherein the end section has an inner contour tapered in sections starting from the distal end, wherein the sealing ring, the separating ring and the cutting ring are arranged such that they are axially movable inside the end section of the fitting, and wherein the holding element has an inner thread for screwing onto an outer thread formed on the fitting and a stop element protruding inwards for abutment against the arrangement of the sealing ring, the separating ring and the cutting ring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VIEGA TECHNOLOGY GMBH & CO KG57439 ATTENDORN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meissner, Kai-Michael Kreuztal, DE 3 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00