Apparatus for manufacturing fiber-reinforced concrete through shooting after inserting bubbles into normal concrete and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10906206
APP PUB NO 20170080599A1
SERIAL NO

15126194

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an apparatus for manufacturing fiber-reinforced concrete through shooting after inserting bubbles into normal concrete and a method for manufacturing the same, which: form fiber-mixed concrete in which the bubbles, fiber-mixed materials, and silica fume are mixed in the normal concrete or form the fiber-mixed concrete in which aggregates, water, and the bubbles are put into and mixed with a mixture, in which cement, the fiber-mixed materials, and silica fume are mixed; and then shoots the fiber-reinforced concrete in which excessive air included in the fiber-mixed concrete is reduced by spraying the fiber-mixed concrete with the high-pressure air when the fiber-mixed concrete is discharged, and of which a slump, drastically increased due to the large amount of bubbles, is reduced to a range of the slump of the normal concrete, thereby improving the production capacity of the fiber-reinforced concrete and shortening operating time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KANGWON NATIONAL UNIVERSITY UNIVERSITY-INDUSTRY COOPERATION FOUNDATION1 GANGWONDAEHAK-GIL CHUNCHEON-SI GANGWON-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yun, Kyong Ku Seoul, KR 6 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00