Fuel cell system with interconnect
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 17, 2018
Grant Date -
Mar 2, 2017
app pub date -
Nov 10, 2016
filing date -
Jun 15, 2011
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The present invention includes an integrated planar, series connected fuel cell system having electrochemical cells electrically connected via interconnects, wherein the anodes of the electrochemical cells are protected against Ni loss and migration via an engineered porous anode barrier layer.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
LG FUEL CELL SYSTEMS INC | 6065 STRIP AVENUE NW NORTH CANTON OH 44720 |
International Classification(s)

- 2016 Application Filing Year
- H01M Class
- 5833 Applications Filed
- 4455 Patents Issued To-Date
- 76.38 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Goettler, Richard | Medina, US | 13 | 19 |
# of filed Patents : 13 Total Citations : 19 | |||
Liu, Zhien | Canton, US | 31 | 51 |
# of filed Patents : 31 Total Citations : 51 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01M Class
- 0 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 17, 2026 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 17, 2030 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
