Centrifugal pump with serrated impeller
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Feb 2, 2021
Grant Date -
Mar 2, 2017
app pub date -
Aug 24, 2015
filing date -
Aug 24, 2015
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A centrifugal pump and an impeller thereof are provided. The impeller defines an outer peripheral edge which includes a plurality of serrations circumferentially thereon. The plurality of serrations are configured such that additional power and momentum are transferred to a working fluid of the pump, which results in an additional pressure rise in the working fluid at relatively low flow rates of the centrifugal pump.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
WOODWARD INC | 1081 WOODWARD WAY FORT COLLINS CO 80524 |
International Classification(s)

- 2015 Application Filing Year
- F04D Class
- 1667 Applications Filed
- 1242 Patents Issued To-Date
- 74.51 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Baryshnikov, Dmitriy | Rockford, US | 8 | 121 |
# of filed Patents : 8 Total Citations : 121 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F04D Class
- 0 % this patent is cited more than
- 4 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 2, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 2, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
