Powder supply apparatus, control method of powder supply apparatus, and control program of powder supply apparatus, and three-dimensional shaping apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10786870
APP PUB NO 20170050270A1
SERIAL NO

15119469

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention quickly supplies a predetermined amount of powder from a hopper to a recoater. A powder supply apparatus includes, as its feature, a hopper, a powder spreader, a powder replenisher, and a pivoting unit. The hopper of the powder supply apparatus stores a powder. The powder spreader spreads the powder on a shaping surface. The powder replenisher of the powder supply apparatus is provided between the hopper and the powder spreader, and replenishes the powder spreader with a predetermined amount of powder. The pivoting unit of the powder supply apparatus causes the powder replenisher to pivot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CMET INC2-5-5 SHIN-YOKOHAMA KOUHOKU-KU YOKOHAMA KANAGAWA 222-0033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daicho, Yuya Kanagawa, JP 6 64
Katou, Yousuke Kanagawa, JP 11 87
Miyano, Hideaki Kanagawa, JP 5 90
Ooba, Yoshikazu Kanagawa, JP 27 309
Suzuki, Koukichi Kanagawa, JP 7 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00