Method for measuring density change of underground material using gravimeter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10330577
APP PUB NO 20170038286A1
SERIAL NO

15301057

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method of measuring a change in the density of an underground material. To measure the change in the density of the underground material, a borehole is installed above a target underground material and a first gravimeter and a second gravimeter are installed outside and inside of the borehole, respectively. Sequentially, a change in the density of the target underground material is calculated based on a first gravitational change and a second gravitational change measured using the first gravimeter and the second gravimeter. According to the method, it is possible to precisely measure the change in the density of the target underground material, such as an oil, a gas, etc., stored in an underground reservoir and carbon dioxide injected into an underground storage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA INSTITUTE OF GEOSCIENCE AND MINERAL RESOURCES (KIGAM)DAEJEON 305-350

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juergen, Neumeyer Calgary, CA 1 2
Kim, Jeong Woo Calgary, CA 47 261

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00