Optimization of switching operations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9897200
SERIAL NO

15223000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of optimizing shifting of a shifting element which fixes a shaft to another component of the drive-train. Three shifting processes are influenced by respective characteristic forms of a control parameter. The first and second characteristic forms are different from one another. Each shifting process has a distinct start and end time (tBeginn, tEnde). The rotational speed of the shaft is a function n(t) of time t. An idealized rotational speed nideal(t):=G{n(t)} is determined by a filter G. First and second evaluation indexes I:=I(t−Δt,t)/I (tBeginnt, tBeginn) are calculated, in which tBeginnEnde. I(ta, tb) is a measure of a deviation of the rotational speed n(t) from the idealized rotational speed nideal(t) over time [ta,tb]. The third characteristic form is chosen based on the first and second evaluation indexes I.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZF FRIEDRICHSHAFEN AGLÖWENTALER STR 20 FRIEDRICHSHAFEN 88046

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Szabo, Tomas Ravensburg, DE 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00