Power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909496
APP PUB NO 20170030264A1
SERIAL NO

15289991

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system, including: a solar energy concentration system, a biomass gasification device, a gas-powered generator, a steam turbine, a steam-powered generator. The solar energy concentration system is connected to a solar energy heat exchange system. The biomass gasification device is connected to the gas-powered generator. The gas outlet of the gas turbine is connected to the gas exhaust heat system. The second steam outlet of the gas exhaust heat system is connected to the second and the third cylinders of the steam turbine. The first steam outlet of the gas exhaust heat system and the steam outlet of the solar energy heat exchange system are connected to a steam mixing regulating system. The mixed steam outlet of the steam mixing regulating system is connected to the first cylinder of the steam turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WUHAN KAIDI ENGINEERING TECHNOLOGY RESEARCH INSTITUTE CO LTDT1 JIANGXIA AVENUE MIAOSHAN DEVELOPMENT ZONE JIANGXIA DISTRICT WUHAN 430212

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yilong Wuhan, CN 68 167
Liu, Wenyan Wuhan, CN 11 15
Tang, Hongming Wuhan, CN 7 19
Zhang, Yanfeng Wuhan, CN 177 515

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00