Compressor system including a plurality of compressors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10330093
APP PUB NO 20170016438A1
SERIAL NO

15209165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A compressor system includes: at least one variable-speed compressor, at least one fixed-speed compressor, a main suction pipe and a main discharge pipe; respective suction pipes of the variable-speed compressor and the fixed-speed compressor are connected to the main suction pipe in parallel, and respective discharge pipes of the variable-speed compressor and the fixed-speed compressor are connected to the main discharge pipe in parallel. The main suction pipe is configured with an oil-gas separation fitting structure, and the oil-gas separation fitting structure is designed to enable most oil of oil-gas mixture from the main suction pipe to move into the variable-speed compressor, and to make the variable-speed compressor stay in an oil-rich state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DANFOSS (TIANJIN) LTDNO 5 FUYUAN RD WUQING DEVELOPMENT ZONE TIANJIN 301700 301700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dong, Ying Tianjin, CN 43 224
Fan, Liang Tianjin, CN 44 151
Genevois, David Tianjin, CN 19 69
Liu, Peng Tianjin, CN 833 6111
Lovan, Kongkham Tianjin, CN 2 5
Zhang, Shuguang Tianjin, CN 85 1858

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00