Map creation system and map creating method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10670410
APP PUB NO 20170010103A1
SERIAL NO

15119510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present invention is to provide a map creation system and a map creating method capable of accurately creating road data on map data used for estimating a road being travelled by a vehicle. A map creation system includes a trajectory data creation unit creating trajectory data of a vehicle travelling in a predetermined area on a first road on the basis of positional information of the vehicle, a representative point extraction unit extracting, of created plural pieces of the trajectory data, representative points located on a side of a second road different from the first road, and a road data creation unit creating data for the first road on map data on the basis of the plural representative points extracted for respective plural predetermined areas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES MACHINERY SYSTEMS LTD1-1 WADASAKI-CHO 1-CHOME HYOGO-KU KOBE-SHI HYOGO 6528585

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hiura, Ryota Tokyo, JP 22 180
Iehara, Masato Tokyo, JP 12 46
Mabuchi, Yoshihiro Tokyo, JP 9 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00