Intergrated fuel cell and energy storage systems and method of operating thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10666058
APP PUB NO 20170005480A1
SERIAL NO

15172758

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical power system, including a fuel cell system having a plurality of fuel cell segments and an energy storage system electrically coupled to the fuel cell system. The energy storage system including a plurality of energy storage system technologies, an energy storage system direct current (DC) bus configured to electrically connect the plurality of energy storage system technologies to the fuel cell system, and an energy storage system technologies management system configured manage impedance of the energy storage system and electric coupling of the energy storage system and the fuel cell system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLOOM ENERGY CORPORATION4353 NORTH FIRST STREET SAN JOSE CA 95134

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ballantine, Arne Palo Alto, US 151 1210
Cottuli, Carl Franklin, US 25 360
Gross, Peter Sunnyvale, US 66 1211
Gurunathan, Ranganathan Bangalore, IN 51 1045
Pmsvvsv, Prasad Sunnyvale, US 38 376

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00