Bicycle brake and method for constructing the profile of a surface portion of a lever of said brake

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10259521
APP PUB NO 20170001681A1
SERIAL NO

15196675

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle brake including a first lever and a second lever is provided. A roller for mutual coupling of the first lever and second lever is pivoted to one of said first lever and second lever and is in rolling contact with a surface portion of the other between said first lever and second lever. The surface portion has a profile defined by a curve that passes by a predetermined number of points of the roller. Each of the points are defined as function of the position taken by the roller during a respective rotation of the roller about a first rotation axis (X1) of the first lever by a respective predetermined angle of rotation and about a second rotation axis (X2) of the second lever by a respective angle substantially equal to said respective predetermined angle of rotation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAMPAGNOLO S R LVICENZA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rosati, Stefano Mira (VE) Venezia, IT 10 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00