Elastic band launcher

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562737
APP PUB NO 20160370142A1
SERIAL NO

14906285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A toy, namely, an elastic band launcher is presented. The invention includes a launch section, two band bridges, a handle section, a trigger assembly, a bridge section, and an anchor. The launch section includes a first launch surface at a first acute angle with respect to a second launch surface. The band bridges are separately disposed along the first launch surface. The trigger assembly is interposed between and fixed to one end of the launch and handle sections. The bridge section includes a pair of opposed ends separately fixed to another end of the handle and launch sections. The anchor is fixed to the second launch surface. The anchor, launch surfaces, band bridges, and trigger assembly are adapted to receive an elastic band. At least one band bridge constrains separation between the sides of the elastic band. The elastic band disposed between the band bridges defines a main pull vector. The main pull vector is disposed at second, third, and fourth acute angles with respect to the second launch surface, the anchor, and the first launch surface, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SUPER IMPULSE USA, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Stack, Benjamin A Broomall, US 10 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00