ICE TRAY APPARATUS AND METHOD
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Dec 22, 2016
app pub date -
Aug 26, 2015
filing date -
Jun 18, 2015
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
In one embodiment an ice tray is manufactured using a material having higher thermal conductivity, hardness, and elongation than those of aluminum. A time or duration to complete making the ice may be shortened. The material can include copper alloy. The material can have an antibiotic effect.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DONGBU DAEWOO ELECTRONICS CORPORATION | 26-29FL 432 TEHERAN-RO GANGNAM-GU SEOUL 135-523 |
International Classification(s)

- 2015 Application Filing Year
- F25C Class
- 163 Applications Filed
- 126 Patents Issued To-Date
- 77.31 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
YANG, Sung Jin | Seoul, KR | 84 | 360 |
# of filed Patents : 84 Total Citations : 360 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- F25C Class
- 23.53 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jun 22, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
