Reductant dosing correction during no dosing periods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10801385
APP PUB NO 20160369677A1
SERIAL NO

15184584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system may include a NOx sensor and a controller. The controller may be configured to interpret a value of a first parameter indicative of an amount of NOx measured by the NOx sensor and interpret a value of a second parameter for a NOx value from a look-up table. The controller may be further configured to determine a correction factor based on the value of the first parameter and the value of the second parameter and generate a dosing command based, at least in part, on the determined correction factor. In some implementations, the NOx value from the look-up table may be based on one or more operating conditions of an engine. In some implementations, the controller may be further configured to update a NOx value of the look-up table based on the determined correction factor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CUMMINS EMISSION SOLUTIONS INC500 JACKSON STREET COLUMBUS IN 47201

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ponnathpur, Chetan Columbus, US 11 86
Sonawane, Sarang S Pune, IN 3 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00