Method for managing a railway vehicle and railway vehicle operating in accordance with such method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9849898
SERIAL NO

15108456

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for managing a railway vehicle which comprises a motor (6) connected to a chassis (2), a first (3) and a second axle (4) functionally connected to the motor (6); a first transmission member (7) of hydrostatic type and a second transmission member (8) of hydrodynamic type (generally defined “gear”, which can be of hydrodynamic or mechanical type) for connecting the motor to the first and second axle; the method comprising the steps of selecting a configuration for managing the vehicle (1) and switching said vehicle between a first operative condition, in which the first transmission member (7) or the second transmission member (8) is active, and a second operative condition, in which both the first transmission member (7) and the second transmission member (8) are simultaneously active, at least as a function of the vehicle (1) management configuration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TESMEC S P A20123 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nitti, Antonio Castellana Grotte, IT 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00