Male connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10646705
APP PUB NO 20160354594A1
SERIAL NO

15103165

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The male connector (1) includes a connector body (10) and a lock nut (50). The connector body (10) includes a male luer (11), first female threading (41) that surrounds the male luer (11), a base end portion (20) that is inserted into a tube (8), a fixed protrusion (21) formed on the base end portion (20), and a spiral protrusion (32) between the male luer (11) and the base end portion (20). The lock nut (50) includes second female threading (52) that is screwed together with the spiral protrusion (32). When the spiral protrusion (32) and the second female threading (52) are screwed together, the base end portion (20) and the lock nut (50) clamp the tube (8). First rotation prevention mechanisms (14, 54) that engage with one another are provided on the connector body (10) and the lock nut (50) such that the lock nut (50) does not rotate relative to the connector body (10) when the tube (8) is clamped.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JMS CO LTDHIROSHIMA 730-8652

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Megumi Hiroshima, JP 3 21
Takimoto, Kazuhiko Hiroshima, JP 7 69
Ueda, Yutaka Hiroshima, JP 155 1808
Uehara, Yasumasa Hiroshima, JP 10 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00