Energy conversion system including a ballistic rectifier assembly and uses thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10670001
APP PUB NO 20160348659A1
SERIAL NO

15233521

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Nanomechanical, nanoelectromechanical, and other molecular-scale pump assemblies are described. In certain embodiments, the pump assembly includes a cavity. The cavity includes a plurality of nanofilaments, a surface proximate at least one of the nanofilaments, a fluid flow path, and an opening. Molecules of a fluid that flows from the opening through the cavity along the fluid flow path collide with the surface or one or more of the nanofilaments such that the molecules are accelerated along the fluid flow path. A molecular-scale pump assembly includes a plate defining a plurality of openings, and a plurality of cantilevered molecular-scale beams positioned over each opening. In certain embodiments, molecules of a fluid are accelerated through the opening by asymmetric oscillation and in other embodiments charges are guided along a conductive channel by asymmetric collisions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRANE AUDIO LLC2101 DONLEY DRIVE SUITE 100 AUSTIN TX 78758

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pinkerton, Joseph F Austin, US 121 2078

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00