Systems and methods for quick dissipation of stored energy from input capacitors of power inverters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10615607
APP PUB NO 20160344192A1
SERIAL NO

15159699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for connecting a photovoltaic module and an inverter having an input capacitor are presented. The photovoltaic system includes a maximum power point tracking (MPPT) controller coupled between the inverter and the photovoltaic module. The MPPT controller includes a direct current (DC) converter configured to reduce, in a forward buck mode, a voltage of the photovoltaic module, to supply power from the photovoltaic module to the input capacitor of the inverter. The photovoltaic system also includes a microcontroller unit (MCU) configured to control the DC converter to allow the photovoltaic module to operate at a maximum power point, and to increase, in a reverse boost mode, a voltage of the input capacitor of the inverter, to dissipate power from the input capacitor in the photovoltaic module, and the MPPT controller is configured to, based upon one or more triggers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEWLIGHT CAPITAL LLC525 MIDDLEFIELD ROAD SUITE 250 MENLO PARK CA 94025

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avrutsky, Mordechay Alfei Menashe, IL 33 3899
Eizips, Daniel Sunnyvale, US 34 2278
Kondrashov, Sergey Los Gatos, US 7 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00