High performance induction plasma torch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10893600
APP PUB NO 20160323987A1
SERIAL NO

15178068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An induction plasma torch comprises a tubular torch body, a plasma confinement tube disposed in the tubular torch body coaxial therewith, a gas distributor head disposed at one end of the plasma confinement tube and structured to supply at least one gaseous substance into the plasma confinement tube; an inductive coupling member embedded within the tubular torch body for applying energy to the gaseous substance to produce and sustain plasma in the plasma confinement tube, and an electrically conductive capacitive shield on an inner surface of the tubular torch body. The capacitive shield is segmented into axial strips interconnected at one end. Axial grooves are machined in the inner surface of the tubular torch body, the axial grooves being interposed between the axial strips.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEKNA PLASMA SYSTEMS INC2935 INDUSTRIAL BOUL SHERBROOKE J1L 2T9

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auger, Alexandre Sherbrooke, CA 12 128
Boulos, Maher I Sherbrooke, CA 35 1113
Dignard, Nicolas Sherbrooke, CA 4 68
Jurewicz, Jerzy Sherbrooke, CA 20 784
Thellend, Sebastien Sherbrooke, CA 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 12, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00