Crystalline gallium nitride containing flourine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10208396
APP PUB NO 20160319457A1
SERIAL NO

15061069

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for growing a crystalline composition, the first crystalline composition may include gallium and nitrogen. The crystalline composition may have an infrared absorption peak at about 3175 cm−1, with an absorbance per unit thickness of greater than about 0.01 cm−1. In one embodiment, the composition may have an amount of oxygen present in a concentration of less than about 3×1018 per cubic centimeter, and may be free of two-dimensional planar boundary defects in a determined volume of the first crystalline composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SLT TECHNOLOGIES INCC/O LOEB & LOEB 10100 SANTA MONICA BLVD SUITE 2200 LOS ANGELES CA 90067

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Xian-An Morgantown, US 14 965
D'Evelyn, Mark Philip Niskayuna, US 49 4716
Hong, Huicong Niskayuna, US 16 1910
Narang, Kristi Jean Voorheesville, US 27 1992
Park, Dong-Sil Niskayuna, US 49 2872
Zeng, Larry Qiang Strongsville, US 6 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00