Transfer apparatus and method of transferring a plurality of discrete articles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9802765
APP PUB NO 20160311631A1
SERIAL NO

15105522

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transfer apparatus (1) for transferring a plurality of discrete articles (3) between a first location and a second location is disclosed. The apparatus comprises a transfer beam (9) comprising at least one article receiving means (10), adapted to be positioned adjacent the first location (7a) to receive at least one article. The transfer beam is also adapted to be adjacent the second location (7b) to discharge the at least one article. First and second bridging conveyors (12a; 12b) are located adjacent the second location and spaced apart such that the transfer beam is movable between the first and second bridging conveyors. A method of transferring articles using such an apparatus is also disclosed. Preferably the articles are abrasive discs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYP O BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Davies, Michael J Swansea, GB 6 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00