Process for manufacturing a thermoplastic composite part

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10773475
APP PUB NO 20160311180A1
SERIAL NO

15103679

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This process for producing a thermoplastic composite part by laying of at least one thermoplastic composite layer on a tool includes laying on the tool a hardened first ply before the laying of the thermoplastic composite layer. The first ply is produced beforehand to the shape of the tool and includes a first material able to experience an attractive force when it is subjected to a magnetic field, and/or to an electrical potential difference, and includes a second material of a thermoplastic resin that is chemically compatible with the resin of the thermoplastic composite layer. The first ply is clamped to the tool by the effect of a magnetic field, and/or of an electrical potential difference, established at the level of the tool. In one form of implementation, the first ply is produced on a first-ply mold that is preferably of convex shape.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS SAS2 ROND-POINT EMILE DEWOITINE BLAGNAC 31700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Soccard, Eric Blain, FR 7 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00