Combine harvester grain cleaning system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9867336
SERIAL NO

15106225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combine harvester including threshing and separating apparatus which are arranged to process a cut crop stream and each having a grate arrangement through which material separated from the crop stream falls under gravity. Grain conveyance means arranged below the threshing and separating apparatus catch the falling grain and material other than grain (MOG). A stratification pan is located below a front region of the threshing and separating apparatus and a return conveyor is located below a rear region of the threshing and separating apparatus, both conveyors being driven in a oscillating manner. The return conveyor conveys said grain and MOG in a forward direction to a front edge thereof which is located above the stratification pan. The stratification pan conveys collected material rearwardly to a rear edge from where the collected material falls under gravity into a cleaning unit. An accelerator roller is provided and is rotatably driven on a transverse axis in front of the front edge of the return conveyor. Material caught by the return conveyor is incident upon the accelerator roller and paddles provided on the accelerator roller serve to accelerate the material from the return conveyor forwardly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGCO A/S8900 RANDERS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bilde, Morten Leth Langaa, DK 37 116
Kristensen, Magnus Baltzer Randers, DK 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00