Current-to-voltage conversion circuit, reception apparatus, and imaging system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9746865
SERIAL NO

15091164

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a current-to-voltage conversion circuit, including: an input/output node configured to input a current signal including a direct current component and an alternating current component, and to output a voltage based on the current signal; an amplification unit configured to input the voltage of the input/output node; an extraction unit configured to output a voltage based on a direct current component of a voltage output from the amplification unit; a first current supply unit configured to supply a current based on the voltage output from the extraction unit to the input/output node; and a second current supply unit configured to supply a current based on the alternating current component of the current signal to the input/output node. The current supplied by the second current supply unit corresponds to a difference between a current of the current signal and the current supplied by the first current supply unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHAJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isoda, Naoki Tokyo, JP 12 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00