Method for producing lamellae for a lamellae package, in particular for electrical machines and generators, device having at least one punch press, and lamellae and lamellae package produced according to the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10923994
APP PUB NO 20160308425A1
SERIAL NO

15101945

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing lamellae for a lamellae package, wherein the lamellae are punched from a metal strip by at least one punching die. At least one part of the contour of the lamella is produced by stream cutting. The method is carried out such that the lamella is still held in the metal strip. The lamella is punched out of the metal strip by the punching die. The stream cutting results in clean cutting edges, which do not require reworking of the lamella. The device for carrying out the method according to the invention has a stream cutting unit upstream of the punching press which has at least one stream cutting head. A wide variety of lamella contours can be cut out of the metal strip with high accuracy using said stream cutting unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FEINTOOL INTERNATIONAL HOLDING AGINDUSTRIERING 8 LYSS 3250

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Böker, Björn Esslingen, DE 11 11
Bauer, Steffen Zaberfeld, DE 9 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00