Motor incorporating reducer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850996
SERIAL NO

14689643

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor-incorporating reducer includes a main body, a rotational actuating member, a flex spline, and an circular spline. The rotational actuating member has a rotating shaft, a wave generator, and a motor. The rotating shaft passes through the main body, and the elliptic wheel is integratedly formed around the rotating shaft. The motor has a magnetic motor rotator that is integratedly formed on the rotating shaft. With the integrated structure, the rotating shaft, the elliptic wheel, and the motor rotator can stably perform rotation, thereby eliminating the risk that the three, when formed separated and assembled, would become non-coaxial due to the resultant tolerance after assembly and have eccentric rotation, and in turn preventing adverse effects on the drive's output torque due to non-coaxial rotation and extending the drive's service life.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HIWIN TECHNOLOGIES CORPNO 46 GONGYEHCHU 37TH ROAD NO 46 GONGYEHCHU 37TH ROAD SITUN TAICHUNG 40768 TAIWAN SITUN TAICHUNG 40768 40768

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chuo, Yung-Tsai Taichung, TW 27 114
Huang, Po-Jung Taichung, TW 13 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00