GAS FUEL SUPPLY APPARATUS
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Oct 20, 2016
app pub date -
Mar 29, 2016
filing date -
Apr 15, 2015
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A hydrogen supply system includes a hydrogen supply passage connected to a FC stack, a plurality of fuel supply units arranged in parallel with each other in the hydrogen supply passage to supply hydrogen gas to the FC stack through the hydrogen supply passage, and a controller to control operations of the fuel supply units. The fuel supply units include an electrically-operated small-flow regulating valve adjustable to any opening degree between full closed and full open and one or more injectors configured to allow fuel gas to flow at a larger flow rate than a flow rate allowed by the small-flow regulating valve in full open.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AISAN KOGYO KABUSHIKI KAISHA | 1-1 KYOWA-CHO 1-CHOME OBU-SHI AICHI 474-8588 |
International Classification(s)

- 2016 Application Filing Year
- H01M Class
- 5833 Applications Filed
- 4455 Patents Issued To-Date
- 76.38 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
NAGATA, Sadatsugu | Aichi-gun, JP | 14 | 6 |
# of filed Patents : 14 Total Citations : 6 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01M Class
- 0 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 20, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
