Constrained anode fiber for rechargeable battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10205187
APP PUB NO 20160293993A1
SERIAL NO

14823122

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Generally, this disclosure provides systems, devices and methods for extending charge cycle life of rechargeable batteries through the use of constrained anode fibers. A battery may include a porous anode fiber configured to produce electrons during discharge of the battery. The battery may also include and an anode current collector layer, configured to provide a conductive path to a first terminal of the battery, wherein the anode current collector layer is concentrically disposed on the anode fiber to constrain expansion of the anode fiber during charging of the battery. The porosity of the anode fiber allows for the constrained expansion to be directed radially inward, decreasing the volume of the porous regions of the anode fiber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95052

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Keates, Andrew Los Gatos, US 17 55
Tiwari, Prabhat Gilbert, US 10 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 12, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 12, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00