Integrated process controller with loop and valve control capability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10845781
APP PUB NO 20160282851A1
SERIAL NO

15077308

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated controller configured to operate in a field includes a network interface module, one or more function modules, and an output module. The network interface module is configured to receive, from a remote host via a communication link, a setpoint for a process variable. The one or more function modules are configured to (i) receive a measurement of a process variable from a field device and (ii) execute logic for a control loop including the field device based at least in part on the measurement of the process variable and the setpoint for the process variable, to generate an output signal independently of the remote host, where the output signal is for controlling the field device. The output module is configured to directly apply the generated output signal to the field device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FISHER CONTROLS INTERNATIONAL LLC205 S CENTER STREET MARSHALLTOWN IA 50158

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anctil, Jim Marshalltown, US 1 4
Brandau, Thomas A Nevada, US 1 4
Cartwright, Carter B Ames, US 6 60
Mandernach, Jordan E Adel, US 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00