Planchet holder for electrodeposition of materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9856573
SERIAL NO

14668923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The planchet holder for electrodeposition of materials includes a container cover configured to securely fit over the mouth of a beaker. An elongate suspension post passes through a through-hole in the cover a predetermined distance, and a holder assembly is coupled to the suspension post to be suspended within the beaker at a select height from the bottom of the beaker. A planchet receptacle extends axially from a body of the holder assembly, and a substrate recess is formed at a distal end of the planchet receptacle for selective placement of a planchet. An endcap is secured onto the planchet receptacle to securely capture the planchet, and a port in the endcap exposes one face of the planchet for electrodeposition of a material. The planchet holder holds the planchet stationary within the beaker and exposes only one face for electrodeposition and subsequent analysis, thereby reducing time and costs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUWAIT INSTITUTE FOR SCIENTIFIC RESEARCHP O BOX 24885 SAFAT 13109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Behbehani, Montaha H A Al-Daiy'Ha, KW 1 2
Uddin, Saif Eagila, KW 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00