Induction heating system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9854627
SERIAL NO

15074156

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention intends to run one induction heating apparatus using a three-phase AC power supply without use of a Scott connection transformer while preventing an occurrence of a phase where no current flows. An induction heating system uses the three-phase AC power supply to run the induction heating apparatus including an induction heating coil, and has an intermediate apparatus including a coil that is wound on an iron core with an even number of turns, forming a closed magnetic circuit. Additionally, a winding start point of the induction heating coil is connected to the U phase of the three-phase AC power supply and a winding end point of the same is connected to a midpoint of the intermediate coil. The winding start point and end point of the intermediate coil are connected to the V and W phases of the three-phase AC power supply, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKUDEN CO LTDKYOTO-SHI KYOTO 607-8345

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tonomura, Toru Otsu, JP 31 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00