ELECTRONIC COMPONENT
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Sep 22, 2016
app pub date -
Mar 17, 2015
filing date -
Mar 17, 2015
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An electric component comprising a terminal electrode and a hot-melt polymer layer formed on the terminal electrode, wherein the hot-melt polymer layer comprises (i) 100 parts by weight of a metal powder and (ii) 1 to 30 parts by weight of a polymer, wherein melt mass-flow rate (MFR) of the polymer is 0.5 to 20 g/10 min. at 120 to 200° C. and 0.3 to 8 kgf.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
E I DU PONT DE NEMOURS AND COMPANY | 974 CENTRE ROAD CHESTNUT RUN PLAZA 721/2340 WILMINGTON DE 19805 |
International Classification(s)

- 2015 Application Filing Year
- H01L Class
- 25498 Applications Filed
- 22451 Patents Issued To-Date
- 88.06 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
INABA, AKIRA | Kawasaki-shi, JP | 52 | 410 |
# of filed Patents : 52 Total Citations : 410 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01L Class
- 0 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 22, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
