Asset management in a process control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10943195
APP PUB NO 20160275426A1
SERIAL NO

14664511

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for improving production of a process control system comprises a processor, sensors connected to one or more assets in the process control system, human-machine interfaces, and a storage memory storing instructions for execution on the processor. The system receives process data via the sensors and determines an input cost of the one or more assets and an output value of the one or more assets. The system provides a net production value of the one or more assets based on the determined input cost and output value. The system stores the input cost, output value, and net production value on a storage memory and provides the input cost, output value, and net production value along with critical asset performance information of asset value, asset performance and opportunity costs for each asset and asset set in the operation to a user via the human-machine interfaces.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC SYSTEMS USA INC70 MECHANIC STREET FOXBOROUGH MA 02035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cusworth, Trevor Westford, US 1 0
Martin, Peter G North Carver, US 10 432

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00