Duct wall surface structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10488040
APP PUB NO 20160273766A1
SERIAL NO

14916045

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a duct wall surface structure which, in a flue of an iron-sheet duct with a hopper through which a solid-gas two-phase stream flows, can enhance the solid particle trapping efficiency of the hopper and reduce the outflow of the solid particles to the duct downstream side. The duct wall surface structure of a flue (10) through which a solid-gas two-phase stream containing large-diameter ash (50) flows includes a first hopper (20A) installed at the lower end of a first vertical flue section (12), installed in such a direction that the stream has a vertical component of velocity, to collect the large-diameter ash (50) from the stream, wherein a low-rebound part (60) having a lower coefficient of restitution than an iron sheet is provided on an inclined surface (21), with which the large-diameter ash (50) collides, on the upstream side in the flow direction from the first hopper (20A).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kiyosawa, Masashi Tokyo, JP 39 149
Kushioka, Kiyonori Tokyo, JP 10 28
Oda, Manabu Tokyo, JP 7 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00