System and method for netlist clock domain crossing verification

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9721057
SERIAL NO

14790318

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for netlist clock domain crossing verification leverages RTL clock domain crossing (CDC) verification data and results. The netlist clock domain crossing verification system (NCDC) migrates RTL-level constraints and waivers to the netlist design so that the user does not have to re-enter them. The NCDC checks the netlist and generates a report that compares RTL-level CDC checking results to the netlist-level CDC checking results to make it easy to see new issues. The NCDC receives and stores netlist corrections from user input or automatically corrects certain CDC violations, in the netlist.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNOPSYS INC690 EAST MIDDLEFIELD ROAD MOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ganai, Malay San Jose, US 21 542
Gupta, Nishant Uttarpradesh, IN 100 495
Kumar, Biswas Pronay W. Bengal, IN 1 7
Mal, Jain Paras Greater Noida, IN 5 27
Mneimneh, Maher San Jose, US 10 73
Movahed-Ezazi, Mohammad Homayoun Saratoga, US 5 21
Sarwary, Mohamed Shaker San Diego, US 15 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00