Burner port block assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10174945
APP PUB NO 20160258621A1
SERIAL NO

15029025

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner port block assembly having a refractory block with a central passageway therethrough and a ceramic extension piece disposed at least partially in the central passageway of the refractory block. The extension piece has a distal end, a proximal end, and a sidewall that defines a central passageway extending between the distal end and the proximal end. The central passageway of the refractory block is provided with a first engagement structure and the sidewall of the extension piece is provided with a second engagement structure. Engagement of the first engagement structure with the second engagement structure connects the extension piece to the refractory block. The burner port block assembly may further include at least one ceramic fiber board having a hole therethrough disposed at the distal end of the refractory block and/or a gasket positioned between the refractory block and the extension piece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLOOM ENGINEERING COMPANY INCHORNING AND CURRY ROADS PITTSBURGH PENNSYLVANIA 15236

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Checkeye, James N Butler, US 2 2
Schalles, David G Jefferson Hills, US 8 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 8, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 8, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00