Process for making lead zirconate titanate (PZT) layers and/or platinum electrodes and products thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10266936
APP PUB NO 20160254439A1
SERIAL NO

15061205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a piezoelectric device comprising providing a deposition chamber, the deposition chamber having reduced pressure therein; loading a substrate into the deposition chamber; sputter depositing hexagonal 001 oriented titanium on the substrate; providing an oxygen anneal to convert 001 oriented titanium into 100 oriented rutile TiO2; sputter depositing a 111 or 100 oriented textured conducting material for use as an electrode; sputter depositing a hexagonal 001 oriented titanium and providing an oxygen anneal in a lead oxide environment to convert 001 oriented titanium into 100 oriented rutile TiO2 or PbxTi1-xO3; sputter depositing textured lead zirconate titanate PbZrxTi1-xO3 having an 001 orientation as a piezoelectric layer, and sputter depositing a textured electrode on top of the textured lead zirconate titanate; whereby processing of the layers within the deposition chamber provides minimized exposure to ambient contamination and improved texturing in the resulting films.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE ARMY THE101 ARMY PENTAGON WASHINGTON DC 20310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mulcahy, James R Bowie, US 2 28
Polcawich, Ronald G Derwood, US 22 160
Potrepka, Daniel M Silver Spring, US 11 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00